A kitchen is the room you miss most when it is torn out, so the schedule matters. How long it takes depends less on the construction and more on decisions and lead times: cabinets, countertops and permits. Here is how a kitchen renovation runs in Edmonton and where the time usually goes.
Typical stages of a kitchen renovation
- Walk-through and quote. We measure, look at plumbing, electrical and ventilation, and give you a written quote.
- Design and selections. Layout, cabinets, counters, backsplash, flooring, lighting and appliances.
- Ordering. Cabinets and special-order items are ordered once the design is signed off.
- Demolition and rough-in. Old kitchen out, then plumbing, electrical and venting changes.
- Inspections, drywall and flooring.
- Cabinet install, then countertop templating. Most stone counters are measured on site after the base cabinets are in.
- Countertops, backsplash, fixtures and appliances.
- Final walkthrough and touch-ups.
Cabinet and countertop lead times
Custom and semi-custom cabinets are built to order, so their lead time often sets the start date. Stone countertops can only be templated once the cabinets are installed, which adds a gap between those two steps. Ask your supplier for current lead times when you choose, and we plan demolition so the kitchen is not torn out long before the cabinets arrive.
Permits for plumbing, electrical and walls
Moving a sink, adding circuits or removing a wall can need permits from the City of Edmonton. A wall that carries load needs a structural plan. Permit time is added before work starts, and inspections must pass before walls are closed. See our renovation timeline guide for how permits fit into the whole job.
Living without a kitchen
Set up a temporary kitchen somewhere else in the house: the fridge, a microwave, a kettle or coffee maker and a folding table. Paper plates save a lot of washing up. We seal the work area with dust barriers and agree on working hours with you before we start.
What causes delays
- Changing selections after ordering.
- Back-ordered cabinets, appliances or special tile.
- Surprises behind the walls: old wiring, leaks or uneven floors.
- Waiting for permits or inspections.
Most of these can be avoided by locking selections early and opening up the walls only when the materials are on site.
Getting a written schedule
Every kitchen is different. With your estimate we give you a written, stage-by-stage schedule so you know when the kitchen comes out and when it is back. Browse our kitchen renovation ideas or see our kitchen renovation service.